Jon Lerche
Aarhus Universitet
H-index: 9
Europe-Denmark
Top articles of Jon Lerche
Title | Journal | Author(s) | Publication Date |
---|---|---|---|
Levelized Cost of Energy Calculations Versus Company Sanctioning Criteria for Offshore Wind Projects. Are Levelized Cost of Energy Estimates too Optimistic? | Are Levelized Cost of Energy Estimates too Optimistic | Jon Lerche Petter Osmundsen Peter Enevoldsen | 2024 |
Causes of delay in offshore wind turbine construction projects | Production Planning & Control | Jon Lerche Søren Lindhard Peter Enevoldsen Hasse H Neve Dan Eggert Møller | 2023/11/18 |
Comparison of Takt Planning Methods Used on Projects of Different Types | Iris D Tommelein Jon Lerche | 2023/6 | |
Identifying the impact on labor productivity from design choices through work sampling | Jon Lerche Søren Wandahl Hasse Neve | 2022/7 | |
What can be learned from variability in offshore wind projects | Energy Strategy Reviews | Jon Lerche Søren Lindhard Peter Enevoldsen Arumugam Velaayudan Jochen Teizer | 2022/1/1 |
Robustness of work sampling for measuring time waste | Proceedings of the 30th Annual Conference of the International Group for Lean Construction (IGLC30) | Søren Wandahl Cristina Toca Pérez Stephanie Salling Jon Lerche | 2022/7 |
Categorisation of the offshore wind production system | International Journal of Operational Research | Jon Lerche Hasse Neve Søren Wandahl Allan Gross | 2022 |
Learning to see value-adding and non-value-adding work time in renovation production systems | Production planning & control | Hasse Neve Søren Wandahl Søren Lindhard Jochen Teizer Jon Lerche | 2022/6/11 |
Modular offshore wind turbine construction-applying Last Planner and Takt | Jon Lerche | 2022/6 | |
The impact of COVID-19 on offshore wind project productivity–A case study | Jon Lerche Sindre Lorentzen Peter Enevoldsen Hasse Højgaard Neve | 2022/4/1 | |
Electrification of Scandinavian Ports: An Interreg project-final report | Jon Lerche Bahram Dehghan Ishita Sharma Peter Enevoldsen Michael Ax | 2022/10 | |
Application of Takt and Kanban to modular wind turbine construction | Journal of Construction Engineering and Management | Jon Lerche Peter Enevoldsen Olli Seppänen | 2022/2/1 |
Combining lean methods to improve construction labour efficiency in renovation projects | Proceedings of the 29th Annual Conference of the International Group for Lean Construction (IGLC29), Lima, Peru | Hasse H Neve Jon Lerche Søren Wandahl | 2021/7 |
A Model to Link Takt Schedules and Operations in Construction | Jon Lerche Hasse Højgaard Neve Allan Gross Søren Wandahl | 2021 | |
The impact of construction labour productivity on the renovation wave | Construction Economics and Building | Soren Wandahl Cristina T Perez Stephanie Salling Hasse H Neve Jon Lerche | 2021/12/1 |
Weather is not the only reason for delayed offshore wind farm installations | Jon Lerche Peter Enevoldsen | 2021/11/23 | |
What a waste of time | Proceedings of International Group of Lean Construction, IGLC2021 | Søren Wandahl Hasse Højgaard Neve Jon Lerche | 2021/7/14 |
Offshore wind project production system: Reducing construction duration through planning | Jon Lerche | 2020/4 | |
Feedback Loop—The Missing Link in Activity Analysis | Hasse H Neve Søren Wandahl Jon Lerche | 2020 | |
Continuous Improvements at Operator Level. | Journal of Engineering, Project & Production Management | Jon Lerche Hasse Neve Søren Wandahl Allan Gross | 2020/1/1 |