Jon Lerche

Jon Lerche

Aarhus Universitet

H-index: 9

Europe-Denmark

About Jon Lerche

Jon Lerche, With an exceptional h-index of 9 and a recent h-index of 9 (since 2020), a distinguished researcher at Aarhus Universitet, specializes in the field of Operations management, renewable energy (offshore wind), Construction management.

His recent articles reflect a diverse array of research interests and contributions to the field:

Levelized Cost of Energy Calculations Versus Company Sanctioning Criteria for Offshore Wind Projects. Are Levelized Cost of Energy Estimates too Optimistic?

Causes of delay in offshore wind turbine construction projects

Comparison of Takt Planning Methods Used on Projects of Different Types

Identifying the impact on labor productivity from design choices through work sampling

What can be learned from variability in offshore wind projects

Robustness of work sampling for measuring time waste

Categorisation of the offshore wind production system

Learning to see value-adding and non-value-adding work time in renovation production systems

Jon Lerche Information

University

Position

___

Citations(all)

270

Citations(since 2020)

270

Cited By

29

hIndex(all)

9

hIndex(since 2020)

9

i10Index(all)

9

i10Index(since 2020)

9

Email

University Profile Page

Aarhus Universitet

Google Scholar

View Google Scholar Profile

Jon Lerche Skills & Research Interests

Operations management

renewable energy (offshore wind)

Construction management

Top articles of Jon Lerche

Title

Journal

Author(s)

Publication Date

Levelized Cost of Energy Calculations Versus Company Sanctioning Criteria for Offshore Wind Projects. Are Levelized Cost of Energy Estimates too Optimistic?

Are Levelized Cost of Energy Estimates too Optimistic

Jon Lerche

Petter Osmundsen

Peter Enevoldsen

2024

Causes of delay in offshore wind turbine construction projects

Production Planning & Control

Jon Lerche

Søren Lindhard

Peter Enevoldsen

Hasse H Neve

Dan Eggert Møller

...

2023/11/18

Comparison of Takt Planning Methods Used on Projects of Different Types

Iris D Tommelein

Jon Lerche

2023/6

Identifying the impact on labor productivity from design choices through work sampling

Jon Lerche

Søren Wandahl

Hasse Neve

2022/7

What can be learned from variability in offshore wind projects

Energy Strategy Reviews

Jon Lerche

Søren Lindhard

Peter Enevoldsen

Arumugam Velaayudan

Jochen Teizer

...

2022/1/1

Robustness of work sampling for measuring time waste

Proceedings of the 30th Annual Conference of the International Group for Lean Construction (IGLC30)

Søren Wandahl

Cristina Toca Pérez

Stephanie Salling

Jon Lerche

2022/7

Categorisation of the offshore wind production system

International Journal of Operational Research

Jon Lerche

Hasse Neve

Søren Wandahl

Allan Gross

2022

Learning to see value-adding and non-value-adding work time in renovation production systems

Production planning & control

Hasse Neve

Søren Wandahl

Søren Lindhard

Jochen Teizer

Jon Lerche

2022/6/11

Modular offshore wind turbine construction-applying Last Planner and Takt

Jon Lerche

2022/6

The impact of COVID-19 on offshore wind project productivity–A case study

Jon Lerche

Sindre Lorentzen

Peter Enevoldsen

Hasse Højgaard Neve

2022/4/1

Electrification of Scandinavian Ports: An Interreg project-final report

Jon Lerche

Bahram Dehghan

Ishita Sharma

Peter Enevoldsen

Michael Ax

...

2022/10

Application of Takt and Kanban to modular wind turbine construction

Journal of Construction Engineering and Management

Jon Lerche

Peter Enevoldsen

Olli Seppänen

2022/2/1

Combining lean methods to improve construction labour efficiency in renovation projects

Proceedings of the 29th Annual Conference of the International Group for Lean Construction (IGLC29), Lima, Peru

Hasse H Neve

Jon Lerche

Søren Wandahl

2021/7

A Model to Link Takt Schedules and Operations in Construction

Jon Lerche

Hasse Højgaard Neve

Allan Gross

Søren Wandahl

2021

The impact of construction labour productivity on the renovation wave

Construction Economics and Building

Soren Wandahl

Cristina T Perez

Stephanie Salling

Hasse H Neve

Jon Lerche

...

2021/12/1

Weather is not the only reason for delayed offshore wind farm installations

Jon Lerche

Peter Enevoldsen

2021/11/23

What a waste of time

Proceedings of International Group of Lean Construction, IGLC2021

Søren Wandahl

Hasse Højgaard Neve

Jon Lerche

2021/7/14

Offshore wind project production system: Reducing construction duration through planning

Jon Lerche

2020/4

Feedback Loop—The Missing Link in Activity Analysis

Hasse H Neve

Søren Wandahl

Jon Lerche

2020

Continuous Improvements at Operator Level.

Journal of Engineering, Project & Production Management

Jon Lerche

Hasse Neve

Søren Wandahl

Allan Gross

2020/1/1

See List of Professors in Jon Lerche University(Aarhus Universitet)

Co-Authors

H-index: 72
Glenn Ballard

Glenn Ballard

University of California, Berkeley

H-index: 35
Markus König

Markus König

Ruhr-Universität Bochum

H-index: 29
Olli Seppänen

Olli Seppänen

Aalto-yliopisto

H-index: 25
Peter Enevoldsen

Peter Enevoldsen

Aarhus Universitet

H-index: 16
Søren Lindhard

Søren Lindhard

Aalborg Universitet

H-index: 10
Hasse Neve

Hasse Neve

Aarhus Universitet

academic-engine