Top articles of Hasse Neve
Title | Journal | Author(s) | Publication Date |
---|---|---|---|
Causes of delay in offshore wind turbine construction projects | Production Planning & Control | Jon Lerche Søren Lindhard Peter Enevoldsen Hasse H Neve Dan Eggert Møller | 2023/11/18 |
Correlation of Construction Workers’ Movement and Direct Work Rates | Journal of Engineering, Project, and Production Management | Søren Wandahl Cristina Toca Pérez Stephanie Therkelsen Salling Hasse Højgaard Neve | 2023/4 |
What can be learned from variability in offshore wind projects | Energy Strategy Reviews | Jon Lerche Søren Lindhard Peter Enevoldsen Arumugam Velaayudan Jochen Teizer | 2022/1/1 |
Categorisation of the offshore wind production system | International Journal of Operational Research | Jon Lerche Hasse Neve Søren Wandahl Allan Gross | 2022 |
Identifying the impact on labor productivity from design choices through work sampling | Jon Lerche Søren Wandahl Hasse Neve | 2022/7 | |
Learning to see value-adding and non-value-adding work time in renovation production systems | Production planning & control | Hasse Neve Søren Wandahl Søren Lindhard Jochen Teizer Jon Lerche | 2022/6/11 |
The impact of COVID-19 on offshore wind project productivity–A case study | Jon Lerche Sindre Lorentzen Peter Enevoldsen Hasse Højgaard Neve | 2022/4/1 | |
Improving construction labor productivity and efficiency in renovation projects | Hasse Højgaard Neve | 2021/5 | |
A Model to Link Takt Schedules and Operations in Construction | Jon Lerche Hasse Højgaard Neve Allan Gross Søren Wandahl | 2021 | |
Lean renovation–a case study of productivity, flow, and time improvements | Peder Johansen Søren Christensen Hasse Højgaard Neve Søren Wandahl | 2021 | |
The impact of construction labour productivity on the renovation wave | Construction Economics and Building | Soren Wandahl Cristina T Perez Stephanie Salling Hasse H Neve Jon Lerche | 2021/12/1 |
What a waste of time | Proceedings of International Group of Lean Construction, IGLC2021 | Søren Wandahl Hasse Højgaard Neve Jon Lerche | 2021/7/14 |
Combining lean methods to improve construction labour efficiency in renovation projects | Proceedings of the 29th Annual Conference of the International Group for Lean Construction (IGLC29), Lima, Peru | Hasse H Neve Jon Lerche Søren Wandahl | 2021/7 |
Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring | Automation in Construction | J Teizer H Neve H Li S Wandahl J König | 2020/8/1 |
Ranking and comparing key factors causing time-overruns in on-site construction | International journal of construction management | Søren M Lindhard Hasse Neve Bo Terje Kalsaas Dan Eggert Møller Søren Wandahl | 2022/11/17 |
Feedback Loop—The Missing Link in Activity Analysis | Hasse H Neve Søren Wandahl Jon Lerche | 2020 | |
Continuous Improvements at Operator Level. | Journal of Engineering, Project & Production Management | Jon Lerche Hasse Neve Søren Wandahl Allan Gross | 2020/1/1 |
Application of last planner system to modular offshore wind construction | Journal of construction engineering and management | Jon Lerche Hasse H Neve Glenn Ballard Jochen Teizer Søren Wandahl | 2020/11/1 |
Combining Takt and Deming Cycles at Operator Level—Practical Study | Jon Lerche Hasse H Neve Søren Wandahl Allan Gross | 2020 | |
Determining the relationship between direct work and construction labor productivity in North America: four decades of insights | Journal of Construction Engineering and Management | Hasse H Neve Søren Wandahl Søren Lindhard Jochen Teizer Jon Lerche | 2020/9/1 |