Gur Mosheiov
Hebrew University of Jerusalem
H-index: 38
Asia-Israel
Top articles of Gur Mosheiov
Title | Journal | Author(s) | Publication Date |
---|---|---|---|
Common due-date assignment problems with fixed-plus-linear earliness and tardiness costs | Computers & Industrial Engineering | Matan Atsmony Gur Mosheiov | 2024/2/1 |
Single machine scheduling to minimize maximum earliness/tardiness cost with job rejection | Optimization Letters | Matan Atsmony Gur Mosheiov | 2024/1/5 |
Due-Date assignment with acceptable lead-times on parallel machines | Computers & Operations Research | Baruch Mor Gur Mosheiov | 2024/6/1 |
Scheduling on parallel dedicated machines with job rejection | International Journal of Production Research | Baruch Mor Gur Mosheiov | 2024/3/23 |
A common due-date assignment problem with job rejection on parallel uniform machines | International Journal of Production Research | Gur Mosheiov Assaf Sarig | 2024/3/18 |
A note: maximizing the weighted number of Just-in-Time jobs for a given job sequence | Journal of Scheduling | Enrique Gerstl Gur Mosheiov | 2023/8 |
A note on lot scheduling on a single machine to minimize maximum weighted tardiness | Journal of Combinatorial Optimization | Gur Mosheiov Assaf Sarig | 2023/7 |
Dynamic scheduling problems in theory and practice | Journal of Scheduling | Stanisław Gawiejnowicz Bertrand Miao-Tsong Lin Gur Mosheiov | 2023/12/14 |
Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity | Computers & Operations Research | Matan Atsmony Baruch Mor Gur Mosheiov | 2023/4/1 |
The LPT heuristic for minimizing total load on a proportionate openshop | Discrete Applied Mathematics | Enrique Gerstl Gur Mosheiov | 2023/10/30 |
Scheduling to maximize the weighted number of on-time jobs on parallel machines with bounded job-rejection | Journal of Scheduling | Matan Atsmony Gur Mosheiov | 2023/4 |
A note on batch scheduling on a two-machine flowshop with machine-dependent processing times | 4OR | Gur Mosheiov Daniel Oron | 2023/9 |
Single machine scheduling with common assignable due date/due window to minimize total weighted early and late work | European journal of operational research | Dvir Shabtay Gur Mosheiov Daniel Oron | 2022/11/16 |
On the tractability of hard scheduling problems with generalized due-dates with respect to the number of different due-dates | Journal of Scheduling | Gur Mosheiov Daniel Oron Dvir Shabtay | 2022/10 |
A Greedy heuristic for solving scheduling problems with bounded rejection cost | Computers & Operations Research | Matan Atsmony Gur Mosheiov | 2022/8/1 |
Single machine scheduling to maximize the weighted number of on-time jobs with job-rejection | Operational Research | Baruch Mor Gur Mosheiov | 2022/7 |
Single machine scheduling with step-learning | Journal of Scheduling | Matan Atsmony Baruch Mor Gur Mosheiov | 2022/12/17 |
Minimizing total completion time with linear deterioration: A new lower bound | Computers & Industrial Engineering | Matan Atsmony Gur Mosheiov | 2022/1/1 |
Single machine lot scheduling with optional job-rejection | Journal of Combinatorial Optimization | Baruch Mor Gur Mosheiov Dana Shapira | 2021/1 |
Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due dates | Journal of Scheduling | Baruch Mor Gur Mosheiov Dvir Shabtay | 2021/12 |